The New Chasis
By Ian Swinkels

 

 

The Restoration

The Re-spray

Rebuilt Engine + Gearbox

The New Chassis

Porsche Cooling

New Engine

Engine Installatio (Trial Fitting)

 

 

Gearbox and rear suspension attached. The standard engine mounts are used with a rubber lined tie down strap system. This does amazing things to the rigidity of the rear end when your driving it.

The chassis seal is bolted down with large head self tappers. New duel fuel lines and brake lines are also installed. The duel fuel line is so one line can be an EFI return line.

                              

Previous Picture                Next Picture

This page was last updated on 04/04/02.